We stop and check at four points Control is carried out not only before shipment but at four separate points in production. Catching a fault at the earliest possible stage is both the cheapest and the fastest solution. If a weaving fault is spotted on the loom, it is corrected with the loss of a few metres; if the same fault is spotted before shipment, the entire batch is at risk. Raw Material Intake Incoming yarn batches are checked against acceptance criteria for count, strength and colour. In-Process During weaving, weight, width and weaving fault checks are repeated at set metre intervals. After Weaving On the woven fabric, surface evenness, weaving defects and handle are assessed. Pre-Shipment Every roll of fabric is inspected one last time for length, width and visual defects, then reported. The tests we apply Weight and width tolerance measurement Shrinkage (dimensional change after washing) test Light fastness test Perspiration and rubbing fastness test Wash fastness test
Raw Material Intake Incoming yarn batches are checked against acceptance criteria for count, strength and colour.
In-Process During weaving, weight, width and weaving fault checks are repeated at set metre intervals.
Pre-Shipment Every roll of fabric is inspected one last time for length, width and visual defects, then reported.